New home foundations
Slab-on-grade and raised foundations for new single-family homes, from layout to final pour.
Engineered plans · seismic hold-downsWe've poured 50+ house foundations across Los Angeles: new homes, ADUs and additions. Footings, slabs and seismic hardware go in to the engineer's plans and pass inspection. We also pour the driveway, patio and walls that go with the house.
Office +1 888-885-5834 · Cell +1 213-267-7743Builders, developers and homeowners call us for the foundation, and we stay for the flatwork. We work from your engineer's plans, coordinate LADBS inspections, and pour with ready-mix from local LA plants.
Slab-on-grade and raised foundations for new single-family homes, from layout to final pour.
Engineered plans · seismic hold-downsBackyard and garage-conversion ADUs, including tight lots with limited truck and pump access.
Slab-on-grade · utility sleeves setNew footings tied into existing foundations for room additions and second-story work.
Dowelled into existing · epoxy anchorsPoured walls for hillside lots, with drainage behind every wall.
Gravel backfill · weep holesDriveways, patios and walkways to finish the job once the house is framed.
5" slab · saw-cut jointsCrack repair, slab leveling and overlays for older homes and slabs.
Epoxy injection · micro-toppingOur own crew and our own trucks, not subcontractors. Every icon below is one person or one truck on our team.
Typical details for the foundations we pour across Los Angeles, dimensioned to the 2025 California Residential Code (CRC), California Building Code (CBC) and CALGreen. Each numbered tag matches a code note under the drawing.
The most common foundation for new homes and ADUs on flat lots: a reinforced slab with turned-down footings at the edges.
Concrete stem walls on continuous footings, carrying a wood floor over a crawl space. Used for traditional homes and for additions that match an existing raised floor.
Steel tendons run through the slab and are tightened after the pour, so the slab stays in compression when clay soil swells and shrinks.
Drilled concrete piers go down to bedrock and are tied together by grade beams. The standard for hillside homes in neighborhoods like the Hollywood Hills.
Reinforced, waterproofed walls that hold back soil on every side, with a drain at the footing. For basements, subterranean garages and levels cut into a hillside.
One thick, double-reinforced slab under the whole building. It spreads the load across weak or uneven soil where separate footings would settle.
Typical details for illustration, not to scale. Every foundation is built to the stamped structural plans, the soils report and the approved permit for that project.
Every finish can be tinted with integral color, from bright white cement to deep charcoal. Tap a finish to see where it works best.
Fine ridges pulled across the wet surface for grip. The standard for driveways, sidewalks and anything that gets wet. Least expensive and easiest to repair.
Every foundation follows the same sequence, so builders know when the framers can start.
We review the structural plans and soils report, walk the site, and send a written, line-item bid.
Layout staked, footings excavated to depth, and forms set to the engineer's dimensions.
Rebar tied, hold-downs and anchor bolts placed, plumbing sleeves set. LADBS signs off before the pour.
Ready-mix placed and finished, then kept moist while it cures. Framers can typically start within days.
We work throughout LA County. If your neighborhood isn't listed, call us. If we can get a truck there, we can pour there.
Tell us about the build and we'll review the plans and walk the site. Bids are free, written and itemized.